ComboCurve: Link to Wells ECL
In this video, we look at the ability to link a well's economic limit and first production date to a separate well's economic limit using the INPT ID.
Related Articles
ComboCurve: Dates
See the Scenario Tooltip Overview Article for all assumptions and modeling concepts In this article we will be covering the Dates model of the scenario page. This includes parameters that will affect your wells' as of/discounting dates (akin to ...
ComboCurve: Data Dictionary
Click here to download the latest version of the ComboCurve Data Dictionary.
ComboCurve: Scenario Tooltip Overview Article
Scenario Tooltip Overview Article Scenario Page (Overview of Main Screen) Top Left Hamburger Icon - to navigate to all CC sections Green Scenario Name - Quick navigation to the project landing page Top Right Guy Icon - Change name, password or log ...
ComboCurve: Production Taxes
ComboCurve: Production Taxes See the Scenario Tooltip Overview Article for all assumptions and modeling concepts In this article we will discuss the Production Taxes model in ComboCurve. Date Triggers Flat: From As Of Date to Econ Limit FPD : Begins ...
ComboCurve: Economic Output Name Changes v28.5
If you would like to download the table to Excel, click the link below v28.5 Economic Output Name Changes If the link above does not work, navigate here and download the attatchment at the bottom of the article. v28.0 Previous Column Names (note that ...